Is It Possible to Revise Without Releasing?

In the product tree, I want to promote the MACHINE-STUDY Drawing from revision A to revision B, but it seems that I have to set it to Released first (if it’s possible to revise without releasing, please let me know).
When I try to release only the MACHINE-STUDY Drawing and move it to the next revision, the system asks me to release all the linked parts inside the drawing as well.
My issue is that I don’t want to release the parts. How can I move the drawing to the next revision without releasing everything?